Find out about our data center and manufacturing projects

Spaceport Integration Facility (Sierra County, NM)

Spaceport Integration Facility (Sierra County, NM)

A first-of-its-kind collaboration with the New Mexico Spaceport Authority, converging solar generation, long-duration storage and hyperscale infrastructure.

Location: Spaceport America, a state-owned spaceport operated by the New Mexico Spaceport Authority.Power: Co-located solar and storage with grid backup; possible export to the grid.

Key facts

  • Targeted stabilization in 2027: 26 MW solar, 120 MWh storage, 5 MW IT baseload.
  • Planned ground break in late 2026 (solar) and data center (late 2027).
  • 50-acre on-base and 2,564-acre off-base leases under negotiation.
Aetherion (New Mexico)

Aetherion (New Mexico)

Potential to be the largest solar-powered data center in the Americas, addressing a long-term grid shortage in the area.

Location: Central New MexicoPower: Central New Mexico/Los Lunas–Southward service corridors: Optional 115 kV, 345 kV and 500 kV grid connections for baseload support and export.

Key facts

  • Projected final phase by 2037: 10.2 GW solar, 40.8 GWh storage, 2.0 GW IT baseload.
  • Planned ground break: solar Q1 2027, data center Q4 2027.
  • 8,733 acres under purchase agreement; 9,680 acres leased.
VGER (Haskell, TX)

VGER (Haskell, TX)

Adjacent to hyperscaler capacity and connectivity with Stargate, in a priority corridor slated for 765 kV.

Location: Haskell, TexasPower: On the emerging West Texas / Rio Grande data corridor, near Google's South Haskell campus and the Clear Crossing substation, with an available 345 kV grid connection to OpenAI/Oracle's Stargate.

Key facts

  • Targeted stabilization by 2028: 500 MW solar, 2.0 GWh storage, 100 MW IT baseload.
  • Planned ground break: solar Q2 2027, data center Q4 2027.
  • 436 acres owned, with a right of first refusal on a further 627 acres.
  • Advanced permitting (limited for behind-the-meter).
5B Joint Venture (Santa Teresa, NM)

5B Joint Venture (Santa Teresa, NM)

Bringing solar manufacturing on-site through a joint venture with 5B Holdings, with on-site production planned for Q3 2027.

Location: Santa Teresa, New Mexico.

Key facts

  • Joint Green Data–5B construction and operation, with a right of first refusal on production supply and the ability to sell excess to third parties.
  • 200 jobs ramping to 500+ (projected), plus local vendor purchasing and tax benefits under evaluation.
  • 5B's shadow-free, high-density layout yields roughly 2× kW per acre, with rapid, low-cost accordion-style ground-mount deployment.